Under Sch3 Reg 22, which item has a 1 Month timeframe?

Study for the NSW Deputy Coal Mine Test with flashcards and multiple choice questions. Each question includes hints and explanations. Prepare thoroughly for your exam!

Multiple Choice

Under Sch3 Reg 22, which item has a 1 Month timeframe?

Explanation:
Under Sch3 Reg 22, safety actions are assigned specific timeframes. Sealing is the one that must be completed within one month. This reflects its role in isolating a part of the mine to prevent gas migration or fire spread, while still allowing adequate time to plan and carry out the work safely. The other items relate to hazards or design criteria that do not carry a one-month deadline—an inrush zone requires immediate controls, a roadway dimension is a design specification, and explosives handling is governed by its own procedures. So sealing is the item with the 1-month timeframe.

Under Sch3 Reg 22, safety actions are assigned specific timeframes. Sealing is the one that must be completed within one month. This reflects its role in isolating a part of the mine to prevent gas migration or fire spread, while still allowing adequate time to plan and carry out the work safely. The other items relate to hazards or design criteria that do not carry a one-month deadline—an inrush zone requires immediate controls, a roadway dimension is a design specification, and explosives handling is governed by its own procedures. So sealing is the item with the 1-month timeframe.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy